Maintenance contracts: never miss a renewal again
· 7 min read · Français · עברית

The maintenance contract for an office building's air-conditioning units ends at the end of March. Nobody has written it down anywhere, except in a file at the back of a cupboard. In April, a competitor calls the building manager, offers a free visit and leaves with a three-year contract. The client wasn't unhappy: simply, nobody had called them back.
For a technical maintenance company (heating, air conditioning, lifts, fire safety, IT, professional equipment), the recurring contract is at the heart of the model. It ensures predictable revenue, fills the technicians' schedule and opens the door to works and equipment replacements. Losing it for lack of a follow-up is the most costly commercial mistake, and the most avoidable.
This article explains why renewals get lost, which schedule to follow to stop missing them, and how a CRM turns every end date into an opportunity to sell.
Why renewals get lost
In most maintenance companies, contracts are well tracked… on the technical side. The field service software knows when to visit, which equipment to check, which technician to send. But the contract end date and the decision to renew belong to nobody. The same causes come up almost every time.
- End dates are scattered. Some in a spreadsheet, some in paper contracts, some in the manager's memory.
- Automatic renewal lulls vigilance. You count on it, until the day the client terminates by letter and you find the letter too late to react.
- Nobody is responsible for the renewal. The technician sees the client, but selling isn't their job; the salesperson is busy with new clients.
- The follow-up comes too late. An email sent fifteen days before the end date gives the client time to say no, not time to think about something better.
As a result, every year part of the portfolio leaves without a sound, and new clients have to be found just to stay at the same level.
What a missed renewal really costs
A lost contract is often thought of as a year of revenue less. That underestimates the loss. A satisfied maintenance client stays on average several years, and each year generates, on top of the contract, call-outs, parts, works and sometimes the complete replacement of a piece of equipment.
In other words, losing a contract means losing the value of the whole relationship to come, not just the next term. And replacing it costs far more than keeping it would have: prospecting, quote, technical visit, onboarding.
Conversely, a few points of renewal rate gained each year add up. A company that goes from 80% to 90% of contracts renewed loses only one client in ten instead of one in five: over three years, the difference represents a considerable share of its portfolio.
The ideal renewal schedule
A renewal is prepared like a sale, with a schedule. Here is the one we recommend for an annual contract.
| When | What | Who |
|---|---|---|
| D-90 | Spot the contract in the list of end dates within 90 days; review the history: call-outs, incidents, complaints | Client owner |
| D-60 | Call the client: satisfaction, planned changes (premises, equipment, budget); offer a review visit | Salesperson or manager |
| D-45 | Review visit: state of the equipment, items to replace, new needs | Technician and salesperson |
| D-30 | Send the renewal proposal, possibly enhanced: extended scope, multi-year contract, higher service level | Salesperson |
| D-15 | Follow up if the proposal has gone unanswered | Salesperson |
| D-0 | Contract renewed, or termination recorded with its reason | Client owner |

This schedule has a double effect. It prevents oversights, of course. But above all, it changes the nature of the conversation: at D-60, you don't ask the client whether they want to renew, you ask how the year went and what is going to change. It is a service conversation, not a sales follow-up.
Tracking maintenance contracts in a CRM
To apply this schedule effortlessly, the end dates must come to you instead of you having to look for them. That is the role of a CRM. For each contract, you only need to know:
- the client and the contact who decides;
- the subject of the contract (equipment covered, service level);
- the start date and the end date;
- the amount and the frequency (monthly or yearly);
- the status: in progress, ended, terminated;
- the person responsible for the renewal.
In Loukka, each contract becomes an order of the contract or subscription type (Orders menu): client, items or label, amount, frequency (monthly, yearly), start date, end date and status. It is created in one click when the opportunity is won, with the services from the quote, or entered directly. Existing contracts are imported from an Excel or CSV file, one line per contract.
Then the end dates come to you. Before each end date, Loukka automatically creates a renewal opportunity, with the same services and a close date set to the end date, and a reminder for the client's owner. The lead time is adjustable (Settings › Organisation › Follow up before the due date): set it to 90 days to follow the schedule above. As long as the contract is neither renewed nor terminated, a new reminder then arrives every week, even after the end date. The Orders menu also offers a To renew filter, to see at a glance all the contracts concerned, the closest first.
When the client renews, you move the renewal opportunity to "Won", then extend the existing contract by the same duration. When they leave, you mark it as terminated: the reminders stop. Loukka never terminates a contract on its own. Each contract keeps its history (reminders, calls, emails, recorded call-outs), and the client's record brings together everything else.
Turning the end date into a sales opportunity
A well-prepared renewal doesn't just renew the contract unchanged. It is the best time of the year to offer more, because the client knows you and you know their equipment.
- Extending the scope: new equipment installed since last year, a second site, enlarged premises.
- A higher service level: a shorter response time, more frequent visits, an on-call service.
- A multi-year contract: two or three years of commitment in exchange for a stable price, which secures revenue on both sides.
- Equipment replacement: an ageing unit, spotted during the review visit, becomes a deal in its own right.
In a CRM, each of these proposals becomes an opportunity, with its lines, its commitment period and its quote, tracked in the pipeline like any other sale. The review visit is no longer just a technical call-out: it is the first meeting of a new deal.
What to do with a terminated contract?
Even with the best schedule, some clients leave. That is no reason to lose sight of them.
First, understand why. A short call, without trying to convince: price, service quality, a move, choice of a competitor? Noted on the record, this reason is precious: if several clients leave for the same reason, it is your offer that needs reviewing.
Then, keep in touch. In the Orders menu, the status filter finds terminated contracts in an instant. A client who left for a competitor may come back a year later if they were disappointed, provided you are still on their mind: a news email a few months before the end of their new contract is often enough.
Frequently asked questions
How long before the end date should a maintenance contract be followed up?
Three months for an annual contract. That lead time leaves room for a conversation, a review visit and a proposal, and comes before most termination notice periods.
Is automatic renewal enough?
It prevents a contract from ending through simple oversight, but it doesn't protect against termination. And in France, towards an individual customer, the law requires the provider to remind them in writing of the option not to renew the contract before the termination deadline. Tracking end dates therefore remains essential.
How do we bring in the contracts we tracked in a spreadsheet?
By importing them: one line per contract, with the client, the label, the amount, the frequency, the start and end dates and the status. The file template downloadable in Loukka gives the expected columns, and a preview shows what will be created before the import. As soon as a contract has its end date, the renewal reminders are in place.
Conclusion: every end date is an appointment
In a maintenance company, the safest revenue is that of the clients you already have. Provided you don't let them go through simple oversight. With end dates in view three months ahead, a clear renewal schedule and a well-prepared review visit, every contract end becomes a sales appointment, and often one more sale.
To see how Loukka tracks a team's clients, lists and follow-ups, the demo is available with no meeting and no commitment.